Contact Book Service made simple: this page covers real local costs, realistic timelines and the next steps for Dunwoody-area homeowners, with a free consultation and installation approved.

Call (470) 847-9076 or send a request.

Free consultation, installation approved. Call (470) 847-9076 or request your free consultation.

How to reach us

The fastest way is to call (470) 847-9076. You can also send the estimate form with your address, the room and what you want to change. We reply to confirm a walkthrough time.

What happens after you contact us

  1. Tell us about the project. Call (470) 847-9076 or use the estimate form with your address, the room, and what you want to change.
  2. Walkthrough. We visit, look at the room and the systems behind it, and take measurements.
  3. Written scope and options. You receive a scope with choices at more than one price level.
  4. Selections and schedule. We agree materials, order lead items and set a start window.
  5. Permits. We confirm what your city or county needs and coordinate inspections.
  6. Build and walkthrough. The work is completed in order, with a final review and punch list.

What to have ready

  • Photos of the room from every corner and of the adjoining spaces.
  • Rough budget range and the window when you would like to start.
  • Appliance models you plan to keep, or the ones you want to buy.
  • HOA rules, past permits or plans for the home if you have them.
  • A list of what works today and what frustrates you about the room.
  • Any deadlines such as a move, a sale or a family event.

Services you can ask about

Here are the main projects homeowners request, with planning ranges that reflect typical Atlanta-area work. They are not quotes.

Questions to ask any remodeling contractor

  • Who will manage the job day to day, and how often will I get updates?
  • Which trades do you use in house and which are subcontracted?
  • Who pulls permits and who meets the inspector?
  • How are changes during the job priced and approved in writing?
  • What is the payment schedule, and is it tied to completed stages?
  • What happens if we find damage behind the walls?
  • How long are the lead times for cabinets, stone and appliances?
  • What warranty applies to workmanship and to materials?

Good answers are specific. If a bid is vague on scope, allowances or schedule, ask for it to be written down before you compare prices.

Planning a kitchen remodel: budget and timeline basics

Most kitchen projects follow the same arc: define scope, set a budget, choose materials, order long lead items, build and inspect. A focused refresh can finish in about four to six weeks on site. A full remodel often takes six to twelve weeks, plus cabinet and stone lead times that can add four to ten weeks before work begins. Layout changes or structural work add design, engineering and permit time.

A practical way to set a budget is to look at what you spend relative to your home value. Many homeowners invest roughly 10 to 15 percent of the home’s value in a major kitchen remodel. For a home worth $600,000 that is about $60,000 to $90,000, and for a $400,000 home it is about $40,000 to $60,000. Smaller scopes cost less, and luxury work costs more, so use it as a starting point and refine it at the walkthrough.

Keep a contingency of about ten percent for what is found once walls are open: outdated wiring, plumbing that needs rerouting or floors that need leveling. Spend first on what you touch every day, such as cabinets, counters, lighting and the layout, and save on finishes that are easy to change later.

Common questions

Is the consultation really free?

Yes. The offer is a free consultation, installation approved. We walk the space, discuss goals and budget and explain realistic scope.

How soon can you visit?

We schedule walkthroughs as availability allows. Call (470) 847-9076 or submit the estimate form and we will confirm a time.

Do you provide fixed prices?

After the walkthrough we write a scope with pricing. Anything that changes the scope is documented before work continues.

Which areas do you serve?

Dunwoody, Sandy Springs, Brookhaven, Chamblee, Peachtree Corners, Alpharetta, Johns Creek, Roswell, Milton, Suwanee, Duluth, Cumming, Norcross, Buford, Sugar Hill, Marietta, Kennesaw, Woodstock, Buckhead and Doraville.

Can I remodel in phases?

Yes. Many homeowners start with cabinets and counters and add flooring or lighting later. We plan the sequence so early work does not need to be undone.

A closer look at the projects we handle

Kitchen Remodeling

A full kitchen remodel replaces the working parts of the room: cabinets, counters, sink and faucet, backsplash, lighting, flooring and often the layout. It is the project where design decisions and trade sequencing matter most, because every choice affects the next one. Typical scope includes demolition and disposal of old cabinets, counters and flooring, framing, plumbing and electrical updates to code, new cabinetry with hardware, soft-close hinges and fillers. Planning ranges run from $18,000 at the entry tier to $150,000 at the top tier, and the schedule is usually 6 to 12 weeks on site, plus lead time for cabinets and stone.

Kitchen and Bath Remodeling

Combining a kitchen and a bathroom in one project lets one crew sequence plumbing, electrical, tile and finish work together and reduces mobilization and supervision overhead compared with running two separate jobs. Typical scope includes kitchen demolition and rebuild with new cabinets and counters, bathroom demolition to the studs where needed, waterproofing, tile and glass in the shower or tub area. Planning ranges run from $32,000 at the entry tier to $220,000 at the top tier, and the schedule is usually 8 to 16 weeks depending on scope and lead times.

Cabinet Installation and Refacing

Cabinets are the largest single cost and the largest visual element in a kitchen. The choice is between replacing them, refacing the existing boxes with new doors and veneer, or installing a new stock, semi-custom or custom line. Typical scope includes measuring and layout verification, removal of existing cabinets and hardware, leveling, scribing and securing new boxes. Planning ranges run from $6,000 at the entry tier to $60,000 at the top tier, and the schedule is usually 1 to 3 weeks of install after a 4 to 10 week order lead time.

Countertop Installation

Countertops take the daily abuse in a kitchen, so material, thickness, edge and seam placement all matter. Installation depends on accurate templating after the cabinets are set and the sink and cooktop models are confirmed. Typical scope includes template after cabinets are installed and secured, fabrication of slabs with sink and cooktop cutouts, delivery, leveling and installation. Planning ranges run from $1,500 at the entry tier to $15,000 at the top tier, and the schedule is usually 1 to 2 weeks from template to install.

Kitchen Island Installation

An island adds counter space, storage and seating, but it needs clearances: generally 36 to 42 inches of walkway around it, with the work aisle wider if two cooks share the room. Adding plumbing or electrical to the island raises cost and permit needs. Typical scope includes layout and clearance planning, base cabinets or custom furniture style island, countertop with overhang for seating. Planning ranges run from $8,000 at the entry tier to $60,000 at the top tier, and the schedule is usually 2 to 5 weeks on site once cabinets arrive.

Backsplash Installation

A backsplash protects the wall behind sinks and cooktops and sets the visual tone of the kitchen. Tile choice, pattern and grout color affect both cost and how easy it is to keep clean. Typical scope includes wall preparation and surface repair, layout and pattern planning, tile setting with proper adhesive and spacing. Planning ranges run from $700 at the entry tier to $9,500 at the top tier, and the schedule is usually 2 to 4 days of install, plus grout curing.

Kitchen Flooring

Kitchen floors face spills, traffic and temperature swings. The right material balances water resistance, comfort and how it meets adjacent rooms. Typical scope includes removal of existing flooring and underlayment, subfloor inspection and leveling, installation of the chosen material. Planning ranges run from $2,200 at the entry tier to $11,000 at the top tier, and the schedule is usually 2 to 5 days.

Kitchen Lighting

A good kitchen uses layers: ambient light from recessed fixtures, task light under cabinets, and accent or decorative light from pendants. Plan wiring before drywall is closed. Typical scope includes lighting layout and switching plan, recessed fixtures and trims, under cabinet lighting and wiring. Planning ranges run from $900 at the entry tier to $14,000 at the top tier, and the schedule is usually 1 to 5 days.

Custom Cabinetry

Custom cabinetry is built to your dimensions, which solves awkward corners, odd wall lengths and special storage needs that stock lines cannot. It costs more and takes longer, but fits the room exactly. Typical scope includes field measurement and design drawings, approval of finishes and hardware, fabrication of boxes, doors and drawers. Planning ranges run from $28,000 at the entry tier to $140,000 at the top tier, and the schedule is usually 8 to 16 weeks of lead time plus 1 to 3 weeks of install.

Small Kitchen Remodel

Small kitchens reward careful planning: every inch of storage counts and a poor layout cannot be hidden. The goal is usually more storage, better light and better workflow without expanding the footprint. Typical scope includes space planning with storage focus, cabinets sized to the room, compact counters and sink. Planning ranges run from $15,000 at the entry tier to $85,000 at the top tier, and the schedule is usually 4 to 8 weeks.

Luxury Kitchen Remodel

A luxury kitchen is defined by custom millwork, premium surfaces, integrated appliances and a designed lighting and ventilation plan. Scope and design time are larger, so budgets and schedules must reflect that. Typical scope includes design development and detailed drawings, structural and layout changes as needed, custom cabinetry and millwork. Planning ranges run from $100,000 at the entry tier to $400,000 at the top tier, and the schedule is usually 4 to 8 months including design and lead times.

Kitchen Layout Redesign

A layout redesign changes how the room works: moving the sink, range or refrigerator, opening a wall or adding an island. It carries the highest planning load because plumbing, electrical, ventilation and structure all interact. Typical scope includes measured drawings of the existing space, layout options and work triangle review, structural review for wall removal. Planning ranges run from $8,000 at the entry tier to $70,000 at the top tier, and the schedule is usually 2 to 8 weeks for the layout portion, plus the rest of the remodel.

Where we work

We serve homeowners across the north Atlanta metro, including Dunwoody, Alpharetta, Johns Creek, Roswell, Milton, Sandy Springs, Suwanee, Duluth, Cumming, Brookhaven, Peachtree Corners, Norcross, Chamblee, Buford, Sugar Hill, Marietta, Kennesaw, Woodstock, Buckhead, Doraville. Browse the service area page for local figures and project pages for each city.

Free consultation, installation approved. Call (470) 847-9076 or request your free consultation.

Contact Book Service: what to expect from a local team

When you plan contact book service, ask for a written scope, a fixed timeline and clear pricing. Our team walks every contact book service project through the same steps. First comes a free consultation, then a measured quote, and finally an approved installation date.

Homeowners researching contact book service can also compare national benchmarks from the National Association of Home Builders and local housing data from the U.S. Census Bureau.

Ready to start? Call (470) 847-9076 to book your free consultation, installation approved. Your contact book service quote is free, and there is no obligation.

Quick answers about contact book service

What affects the price of contact book service?

Size, materials, layout changes and access all affect the price of contact book service. A free consultation gives you a clear number before you commit.

How do I get started with contact book service?

Call (470) 847-9076 or book online. Your contact book service consultation is free, and installation is approved on your schedule.

Can I compare quotes for contact book service?

Yes. Compare scope, materials and timelines side by side when you review any contact book service quote.

Where do you work?

We serve Dunwoody and nearby Metro Atlanta cities. Ask us about contact book service availability in your neighborhood.

Explore Dunwoody Kitchen Remodeling

AboutContact & Book ServiceBook Online / ScheduleReviews & TestimonialsService Areas We CoverService AreaFAQFinancingGet an EstimateProjectsKitchen Remodel IdeasBlog

Latest guides

Kitchen Appliance Package Planning: Sizes, Specs and Lead TimesKitchen Ventilation and Range Hood Guide: Sizing, Ducting and NoiseKitchen Cabinet Hardware Guide: Pulls, Knobs, Hinges and SlidesWorking With a Designer: What They Do and How to Get the Most From ThemRemodel in Phases: How to Spread a Renovation Over TimeAdding Value Before Selling: Which Updates Are Worth It?Hardwood vs Luxury Vinyl Plank: Which Is Better for Your Home?Cabinet Refacing vs Replacement: Cost, Time and When Each Makes Sense

Free consultation, installation approved. Call (470) 847-9076.

How much of a kitchen remodel comes back at resale (2025)

National averages from the 2025 Cost vs Value report show that a smaller, well-planned minor remodel recouped more than its cost at resale, while larger remodels recouped a smaller share. Bar length shows percent of job cost recouped. Resale value is not guaranteed in any market, so treat this as context for planning your scope.

$522 billionprojected U.S. homeowner remodeling spending by end of 2026
+2.9%projected year-over-year growth, early 2026
+1.6%projected year-over-year growth, end of 2026

Sources: Remodeling magazine, 2025 Cost vs Value Report (national averages); Pro Remodeler, Jan. 29, 2026 reporting the Harvard Joint Center for Housing Studies Leading Indicator of Remodeling Activity (JCHS). National figures, not Dunwoody-specific quotes.

Free consultation, installation approved. Tell us about your kitchen and we will walk the space, talk through scope and priorities, and put the plan in writing.

Free consultation, installation approvedTell us about your Dunwoody kitchen project and we plan it with you.
☎ Call (470) 847-9076Request Estimate